The composite gas cylinder inspection equipment for respirator produced by our company is applicable to mobile composite gas cylinder (composite gas cylinder with carbon fiber full winding aluminum alloy liner for respirator) with nominal water volume not more than 12L, nominal working pressure not more than 30 MPa, used for filling respiratory gases, and with the temperature range of 40℃~60℃ and can be repeatedly inflated.

 

Composite gas cylinders regular inspection items include appearance inspection, internal inspection, bottle mouth inspection, hydraulic test, internal drying, bottle valve inspection and air tightness test.

 

The Composite Gas Cylinder Inspection Equipment for Respirators Manufacturer!

 

Hangzhou Dongbei Mechanical & Electrical Equipment Co. Ltd. is a large-scale manufacturer specializing in the production of various types of gas cylinder testing, cleaning, filling, conveying and painting equipment.

 

 
 
Why choose us
 

Production Capacity
The production department of the company has 1 production minister, 1 deputy production minister, 8 team leaders, 25 skilled workers, with strong organizational and production capacity, and can complete the production tasks assigned by the company on time and in quality and quantity.

 

Quality assurance
We have 100% quality guarantee to customers. We will be responsible for any quality problem.

 

Customer Service
Our customer service team is committed to providing exceptional support and addressing any concerns promptly. We prioritize clear communication and proactive problem-solving to ensure a seamless experience for every client.

 

Configuration

Electric fan, electric heater, gas cylinder holder, etc;

Number of gas cylinders to be dried at one time at the same time

6;

Drying time

About 20 minutes;

Power supply

220V 50Hz;

Temperature automatic control

 

Temperature test and display function.

 

 

Equipment Structure Description

 
 

Frame: The frame is the main component of the equipment, with all other parts mounted on it, forming the primary structural framework of the equipment.

 
 

Water Pump: The power source for cylinder cleaning, used to pressurize cleaning solution or water, which is then sprayed onto the inner surface of the cylinder to remove internal contaminants.

 
 

Cylinder Positioning Device: The equipment uses a four-position positioning system, primarily for positioning and controlling cylinders awaiting cleaning, facilitating internal cleaning of the cylinders.

 
 

Cleaning Device: Primarily used for internal cleaning of cylinders.

 
 

Electrical control panel: All electrical components of the equipment are installed in the electrical control panel, facilitating operation and centralized control of the internal cleaning of gas cylinders.

 

 

Production process: Description of the links from raw material procurement to finished product delivery
Internal Dryer For Composite Cylinders for Breathing Apparatus
Internal Cleaning Machine for Composite Cylinders for Breathing Apparatus
Air Tightness Test Machine for Composite Cylinders for Breathing Apparatus
Air Tightness Test Machine for Composite Cylinders for Breathing Apparatus

Design planning and raw material procurement
Engineers complete structural design, mechanical calculation and 3D modeling according to requirements to form production drawings and process planning. The procurement department selects qualified suppliers and purchases core materials such as steel, castings, and electrical components to ensure that the raw materials meet production standards.

 

Processing and component forming
The plates are cut into the required shape and formed by bending machines or plate rolling machines. Key components (such as gears and bearing seats) are manufactured by casting or forging processes and heat treated to improve hardness and toughness. Then, the parts are precisely processed by lathes, milling machines and other equipment to ensure that the dimensional accuracy meets the requirements of the drawings. After drilling, tapping and other processes are completed, the parts need to be subjected to preliminary quality sampling.

 

Assembly and surface treatment
The main frame of the equipment is formed by welding the frame, rollers and other structural parts. Subcomponents such as the transmission system and hydraulic system are pre-installed at this stage, and compatibility is verified by functional testing. Sandblast or shot blast the equipment to remove the surface oxide layer and enhance the adhesion of the coating. Spray anti-rust paint or epoxy resin wear-resistant paint, and use electroplating or galvanizing for anti-corrosion treatment for small parts.

 

Assembly and quality inspection
Integrate modules such as power system and control system to complete the mechanical assembly of the whole machine. Perform no-load test (check running stability) and load test (simulate actual working conditions to verify efficiency). Key dimensions must be checked for consistency with drawings, and weld quality must be tested by ultrasonic or X-ray non-destructive testing. Finished equipment must pass performance acceptance (such as processing volume and energy consumption) and safety testing.

 

Packaging and delivery
Finished product packaging Use shockproof and anti-rust materials to package the equipment in sections, and mark information such as product name, specifications and production date. Choose land or sea transportation according to transportation needs to ensure that there is no damage during the logistics process. The warehouse system completes the delivery registration after checking the order information, and updates the inventory data in the ERP system simultaneously.

 

Precautions of Cylinder Inspection Equipment for Respirators

The fan should be started before the electric heater is turned on to keep the positive flow of airflow when the machine is turned on.

Prevent hot air from entering the fan and causing damage to the fan.

At the end of the work, first turn off the electric heater, open the control valve , discharge the residual heat in the heater, and the outlet temperature should be reduced to room temperature, then stop the fan.

If there is any abnormality during the operation of the high-pressure fan, the power supply should be disconnected immediately for inspection, and the power should be turned on again after repair.

The air inlet and outlet filters of the fan should be kept clean frequently to avoid clogging.

High temperature will be generated during the use of the fan, and contact with high temperature should be avoided to avoid burns.

Electrical equipment should always check whether the insulation and grounding is good.

Operators should wear labor protection equipment, be careful of scalding.

The equipment should be operated and maintained by specialized personnel.

 

Packing and Shipping

 
productcate-400-300
productcate-600-450
productcate-400-300
productcate-400-300

 

FAQ

 

Q: Can I get your price list ?

A: Yes, Sure. In order to send you our available offered price. Please choose the products and let us know the product model and requirement in detail.

Q: Do you have stock for all items?

A: In general, we have some stock, while if you need a bulk order, we still need time to produce it. Of course, we will inform all details you before your payment.

Q: What is payment terms ?

A: Sample order : 100% full payment before start to production;
Large order : 30% deposit first, 70% pay after see the BL copy ;

Q: Can give free sample ?

A: Free : if small spare parts and the cost not too much is ok ;
Not Free : the cost expensive and all the machine can not be free ;

Q: How long can be finished the goods ?

A: Delivery date: 10-15 working days after deposit paid
Two years warranty, when the products reach to destination.

Q: How can i get the price?

A: We usually quote within 24 hours after we get your inquiry(Except weekend and holidays). If you are very urgent to get the price, please email us or contact us in other ways so that we can offer you a quote.

Q: Can I buy samples placing orders?

A: Yes.Please feel free to contact us.

Q: What is your payment term?

A: T/T,Western Union,Alipay,MoneyGram,and Paypal.This is negotiable.

Q: What is the shipping method?

A: It could be shipped by sea,by air or by express(EMS,UPS,DHL,TNT,FEDEX and ect).Please confirm with us before placing orders.

Hangzhou Dongbei Mechanical And Electrical Equipment Co., Ltd. is one of the most professional composite gas cylinder inspection equipment for respirators manufacturers and suppliers in China. Please feel free to buy high-grade machinery made in China here and get pricelist from our factory. All customized machines are with high quality and low price.

Air Tightness Test Machine For Composite Cylinders For Breathing Apparatus, composite gas cylinder inspection equipment for respirators, Internal Cleaning Machine For Composite Cylinders For Breathing Apparatus
Send Inquiry
Contact usif have any question

You can either contact us via phone, email or online form below. Our specialist will contact you back shortly.

Contact now!