The cryogenic insulated cylinder inspection equipment produced by the company is suitable for use under normal ambient temperature (-40℃~60℃), filling medium for liquid oxygen, liquid nitrogen, liquid argon, liquid carbon dioxide, liquid nitrous oxide and liquefied natural gas and other low-temperature liquids, with a design temperature of not higher than -196℃, and with a repeatable refillable welded insulated gas cylinders at a nominal working pressure of 0.2MPa~3.5MPa. It is also suitable for use under normal ambient temperature (-40℃~60℃), the filling medium is liquefied natural gas, as the fuel tank of automobile, the design temperature is not higher than -196℃, and the nominal working pressure is 0.6 MPa~3.5 MPa, which can be refilled repeatedly as the liquefied natural gas cylinder for automobile.
The cryogenic insulated cylinder inspection items include: external inspection, safety accessories inspection, valves and piping inspection, air tightness test, static evaporation rate test.
The Cryogenic Insulated Gas Cylinder Inspection Equipment Manufacturer!
Hangzhou Dongbei Mechanical & Electrical Equipment Co. Ltd. is a large-scale manufacturer specializing in the production of various types of gas cylinder testing, cleaning, filling, conveying and painting equipment.
-
Vacuum Pumping Equipment for Welded Insulated Gas CylindersThe equipment is mainly used for vacuuming the interlayer of welded insulated gas cylinders to ensure the stable interlayer vacuum degree for a long time after sealing of gas cylinders, and then...view more
-
Nitrogen Replacement Equipment for Welded Insulated Gas C...This device is mainly used to deal with the residual medium in the cryogenic insulated-cylinder, and the device utilizes clean nitrogen to replace the residual medium.view more
-
Air Tightness Test Equipment for Welded Insulated Gas Cyl...This equipment mainly adopts the liquid coating method to carry out air-tightness test on cryogenic insulated-cylinder in order to detect the sealing condition of valves, pipelines, meters and...view more
Why choose us
Production Capacity
The production department of the company has 1 production minister, 1 deputy production minister, 8 team leaders, 25 skilled workers, with strong organizational and production capacity, and can complete the production tasks assigned by the company on time and in quality and quantity.
Quality assurance
We have 100% quality guarantee to customers. We will be responsible for any quality problem.
Customer Service
Our customer service team is committed to providing exceptional support and addressing any concerns promptly. We prioritize clear communication and proactive problem-solving to ensure a seamless experience for every client.
|
Applicable cylinder specifications |
Maximum external diameter: φ800mm, Minimum external diameter: φ450mm, Maximum length: 2200mm, Minimum length: 1150mm |
|
Inner volume of applicable cylinders |
10~500 liters/pc. |
|
Rotary vane pump pumping rate |
63m³/h (17.5L/S) |
|
Inlet/outlet connection |
DN KF40 |
|
Molecular pumping rate |
600L/S |
|
Pump power |
0.75KW |
|
Power supply |
380V, 50HZ |

- Utilizing the automatic pressure regulation device of the low-temperature insulated gas cylinder, the residual liquid in the cylinder to be tested is transferred through a specially designed low-temperature pipeline to the low-temperature liquid storage tank. The liquid is then vaporized by the vaporizer, regulated, and stored in the standby cylinder group. Clean nitrogen is then used to purge the cylinder to be tested.
- The equipment structure adopts a closed-loop design, with the frame undergoing overall powder coating treatment;
- Equipped with residual liquid and gas recovery functionality.
- Flammable gas content (V) after replacement < 2%.
Operating Instructions




The equipment uses a three-phase four-wire 380V power supply. Ensure the neutral wire is properly connected. Before starting the rotary vane pump, briefly activate the motor to adjust its rotation direction. Do not start the motor in reverse to prevent oil from entering the molecular pump. If the motor does not rotate after connecting the wiring with phase loss protection and reverse rotation protection, simply swap the wire terminals.
First connect the piping and confirm there are no leaks before starting the rotary vane pump. When evacuating the storage tank, open the valve slightly to prevent the intake of pearlite sand. Once the pressure reaches 100 Pa, fully open the valve. The molecular pump may only be started after the vacuum measured by the resistance gauge reaches 10 Pa (gauge reading around 8.0E0).
Under no circumstances should the molecular pump be exposed to atmospheric pressure during operation, as this will immediately cause the motor to burn out and become inoperable.
Avoid any violent vibrations during molecular pump operation. Place air-cooled pumps in a well-ventilated area.
After starting the molecular pump, the vacuum level measured by the ionization gauge will significantly increase, indicating normal operation of the molecular pump.
When shutting down, first insert the vacuum port plug, then turn off the molecular pump, and immediately close the high-vacuum check valve.
Wait until the molecular pump has completely stopped before stopping the rotary vane pump.
When the equipment is not in use, it is best to disconnect the equipment piping to keep the system in a vacuum state.
When transporting the equipment in separate parts, ensure that the inlet and outlet of the rotary vane pump are sealed with blind flanges to prevent oil leakage. The molecular pump must be transported in an upright position. When shipping, drain the engine oil directly into a small bottle, and add it again when using.
Production process
Design planning and raw material procurement
Engineers complete structural design, mechanical calculation and 3D modeling according to requirements to form production drawings and process planning. The procurement department selects qualified suppliers and purchases core materials such as steel, castings, and electrical components to ensure that the raw materials meet production standards.
Processing and component forming
The plates are cut into the required shape and formed by bending machines or plate rolling machines. Key components (such as gears and bearing seats) are manufactured by casting or forging processes and heat treated to improve hardness and toughness. Then, the parts are precisely processed by lathes, milling machines and other equipment to ensure that the dimensional accuracy meets the requirements of the drawings. After drilling, tapping and other processes are completed, the parts need to be subjected to preliminary quality sampling.
Assembly and surface treatment
The main frame of the equipment is formed by welding the frame, rollers and other structural parts. Subcomponents such as the transmission system and hydraulic system are pre-installed at this stage, and compatibility is verified by functional testing. Sandblast or shot blast the equipment to remove the surface oxide layer and enhance the adhesion of the coating. Spray anti-rust paint or epoxy resin wear-resistant paint, and use electroplating or galvanizing for anti-corrosion treatment for small parts.
Assembly and quality inspection
Integrate modules such as power system and control system to complete the mechanical assembly of the whole machine. Perform no-load test (check running stability) and load test (simulate actual working conditions to verify efficiency). Key dimensions must be checked for consistency with drawings, and weld quality must be tested by ultrasonic or X-ray non-destructive testing. Finished equipment must pass performance acceptance (such as processing volume and energy consumption) and safety testing.
Packaging and delivery
Finished product packaging Use shockproof and anti-rust materials to package the equipment in sections, and mark information such as product name, specifications and production date. Choose land or sea transportation according to transportation needs to ensure that there is no damage during the logistics process. The warehouse system completes the delivery registration after checking the order information, and updates the inventory data in the ERP system simultaneously.
Packing and Shipping




FAQ
Hangzhou Dongbei Mechanical And Electrical Equipment Co., Ltd. is one of the most professional cryogenic insulated gas cylinder inspection equipment manufacturers and suppliers in China. Please feel free to buy high-grade machinery made in China here and get pricelist from our factory. All customized machines are with high quality and low price.
Nitrogen Replacement Equipment For Welded Insulated Gas Cylinders, Gas Cylinders Vacuum Pumping Equipment, Insulated Gas Cylinders Vacuum Pumping Equipment